PRIZEWATERWALL, have been offering engineering and technical services to Oil and Gas Companies both as main and sub contractors. The availability and reliability of our resources to generate preliminary layouts and system diagrams from Front end engineering and design (FEED) to detailed design using the most recent software of Computer aided design integrated with procurement and material control contributed to our growth in this business over the years.
Our capability to develop preliminary layouts and system diagrams into fully engineered work-packs and perform the required fabrication, installation and commissioning has also been a contributing factor to our continuous patronage.
Our Offshore/Onshore Logistics and Supplies along side with our Foreign/Local Procurement have also witnessed tremendous growth over the years. Some of our activities are as depicted in the following slides.
S/N
|
Client
|
Project
|
Location
|
Date
|
Value
|
1
|
Global Marine Limited
|
Construction of 40man Houseboat
|
|
2009
|
|
2
|
WAGP (NACAP)
|
Pipeline Project
|
Badagry – Lagos
|
2009
|
|
3
|
NBTC
|
Reclamation of 12 hectares of swampy land
|
Ogbe-ijoh
|
2009
|
|
4
|
Setraco
|
6km canalization
|
Olero Creek
|
2009
|
|
5
|
Anotech
|
Supply of Crew/Security Vessel for Agip Offshore Operations
|
Agip
|
2009
|
|
6
|
DESOPADEC
|
6km x 6” (150mm) Pipeline, Repair of Gen. Set, 1 x 20 HPS Pump Re-Flush Boreholes 2 Nos.
|
DESOPADEC
|
2009
|
|
7
|
PPMC
|
Installation of Dual 4”Km Flowline
|
Ossiomo-5 to Ossiomo-2 Manifold
|
2009
|
|
8
|
ROTEC/DSMENV
|
Dredging of Orogodo River and Erosion Control
|
Agborand Environs
|
2010
|
|
9
|
Nigercat construction company
|
Stock pile of 300,000 cubic meters of sand (trans ode itsekiri road)
|
Ode-Itsekiri, Delta State
|
2010
|
|
10
|
Rotec/DSMENV
|
Dredging of canals and reclaimation works
|
Esisi,Warri
|
2010
|
|
S/N
|
Client
|
Project
|
Location
|
Date
|
Value
|
11
|
Setraco
|
Stock pile of 200,000 cubic meters of sand
|
Patani, Delta State
|
2010
|
|
12
|
PPMC
|
Emergency Pipeline Repair Cover (Call out)
|
Warri – Benin Segment of System 2A Pipeline
|
2009
|
|
13
|
Nigerian Gas Company
|
Patch Weld Repair of 3Nos. Leak points: Opuedebubors and Ijala on the 20” NGC Gas Pipeline on ELP-A near Escravos
|
Opuedebubors and Ijala
|
2010
|
|
14
|
Pan Ocean
|
Fabrication and Installation of 2” x4” Deluge water hydrant
|
Ovadje- Oghara Gas Plant
|
2010
|
|
15
|
Pan Ocean
|
Fabrication and Installation of 4”x6” Deluge water hydrant
|
Ovadje – Oghara Gas Plant
|
2010
|
|
16
|
Warri North Local Govt. Council
|
Bush clearing reclamation and land scalping
|
Oghey Warri North LGA
|
2010
|
|
17
|
Pan Ocean
|
Fabrication/Installation of Meter Skide Sheds
|
Ovadje/ Oghara
|
2011
|
|
S/N
|
Client
|
Project
|
Location
|
Date
|
Value
|
18
|
Woksons Int’l Ltd
|
Sand search
|
Okerenkoko
|
2011
|
|
19
|
Setraco
|
Sand search
|
Olero Creek
|
2011
|
|
20
|
Setraco
|
Sand search
|
Ugbokodo
|
2011
|
|
21
|
Seplat
|
Sand search
|
Ugberikoko
|
2011
|
|
22
|
Setraco
|
Sand search
|
Ugbolokposo
|
2012
|
|
23
|
Setraco
|
Sand search
|
Isama
|
2012
|
|
24
|
Seplat Petroleum Development Company
|
Provision of Dredging Services in The Niger Delta
|
Sapele Infill
|
2013
|
|
25
|
Seplat Petroleum Development Company
|
Provision of Dredging Services in The Niger Delta
|
Sapele West
|
2013
|
|
26
|
Seplat Petroleum Development Company
|
Provision of Dredging Services in The Niger Delta
|
Ovhor Field Manifold
|
2014
|
|
27
|
Seplat Petroleum Development Company
|
Provision of Dredging Services in The Niger Delta
|
Sapele West well 17 and 18
|
2014
|
|
S/N
|
Client
|
Project
|
Location
|
Date
|
Value
|
28
|
Seplat Petroleum Development Company
|
Provision of Dredging Services in The Niger Delta
|
Ovhor Feild
|
2014
|
|
29
|
ROYAL GATE Int’l Ltd
|
Stock Pile of 200,000 cubic meters of sand
|
Ugbolokposo
|
2014
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|